Pages

Friday, September 25, 2009

Progress with My Knitting Project

I just started my fifth skein, and knitting the bottom part. Progress was very slow because I really did not have the time to knit, plus somehow I lost my interest to knit. I really hope that I could finish this before August was over, otherwise I could not meet my goal to publish 3 patterns in a year. It was almost finish actually, only a few inches in the bottom, and I could pick up and knit the sleeves. I planned to make long sleeves this time.

Progress on my knitting



I like the pattern on the waist part

5 comments:

  1. I'd love to wear that! It seems warm with long sleeves, but surely will be fabulous.
    My crochet tunic design has similar features, esp. the emphasis on the waist, but I made it with cap sleeves.

    ReplyDelete
  2. This is such a pretty project, Lily. Thanks for showing us!

    ReplyDelete
  3. Very nice! You always have such beautiful designs.

    ReplyDelete
  4. Another gorgeous design. I also love the color!

    ReplyDelete